fallback

A few various recent kitchen refurbishments

Apartments in Coventry; Arley;   Compact kitchen in Coventry Magnet kitchen with butler sink and oak tops in Nuneaton Bulkington; Howdens kitchen with bespoke fridge housing in Coventry

fallback

Loft Stair in Bedworth

Our client asked us to upgrade his access to his loft office. We made and installed a bespoke staircase and partitioned it off from the bedroom with a 30 minute fire resistance.      

fallback

Loft Conversion in Rugby

We were asked to create a studio / storage room by our client, We installed new floor joists and flooring , new access and fully insulated and plastered the room whilst providing large eaves storage ares                                       […]

fallback

Extension and landscaping works in Leamington

We built a ground floor extension with aluminium bifold doors and Velux roof windows , We then landscaped the garden with raised beds , new fencing and porcelain tiles throughout          

fallback

External Staircase in Twycross

We demolished and disposed of the existing rotten stair and built a bespoke new stair on site from tanalised timber This is before ;                                     And these are after ;            

fallback

Kitchen in Coventry

We removed a load bearing dividing wall to create a kitchen / diner and installed a new Howdens white slab kitchen and breakfast bar  

fallback

Kitchen Horeston Grange

Here we removed a load bearing wall to create an open plan kitchen/ diner ( with full building regs approval ) , we partitioned off the lounge from the dining room and installed a door for access We then installed a new Howdens kitchen with solid oak worktops to form a breakfast bar  

fallback

New Kitchen in Canley

We removed the old kitchen and installed a new Howdens shaker units with solid oak worktops and an acrylic splashback all round , this was finished off with new oak effect LVT flooring    

fallback

Bathroom refurbishment Horeston Grange

We completely stripped out and extended our clients bathroom to give room for a large walk in shower . The room was stripped back to brick and re plastered . It was fully tiled and new sanitary ware and radiator installed and had it all back and running within the week that they were on […]